Students give the RailTrail Train Station a much-needed facelift

June 11, 2017

After 5 years of Mother Nature with her sun and weather, it was time for the RailTrail Train Station in Port Elgin to get a facelift. The station, located where the original train station once stood, was constructed by Saugeen District Secondary School (SDSS) students under the direction of teacher Bud Halpin. Once again, SDSS students stepped forward, and the station was given a fresh coat of paint by the “period 4 Technology Class” under the guidance of teacher, Howard Barker. Paint and supplies were provided by the Port Elgin Rotary Club.

Other updates